Machine engineering and hydraulic steelwork

Our customers expect hydraulic steel structures with a high degree of durability and low maintenance requirements. Our engineers have many years of experience in the planning, design, calculation, monitoring and supervision of hydraulic steel construction projects throughout Germany. The latest developments in the fields of drive and materials technology are taken into account in all project phases within the fully realised 3D planning.

Expertise:

  • Sluice gates
  • Weir locks
  • Ship lifts
  • Oil-hydraulic mechanical drives
  • Extraction systems at dams
Altarmwehr Quitzöbel

The oxbow weir is located in the north-east of Saxony-Anhalt and was built around 1936-1937 for water regulation and flood protection. The weir system consists of a double sweeping half-timbered gate as a weir closure and a barge lock. Both parts are separated by a massive centre pillar and bordered by two massive edge pillars.

Client: Wasserstraßen-Neubauamt Magdeburg

Processing period: 2019 –…

Read more

Sturmflutsperrwerk Greifswald-Wieck

The construction of a barrage in Greifswald-Wieck is included in the General Plan for Coastal and Flood Protection in Mecklenburg-Vorpommern under the status of priority urgency. The structure forms an integral part of the Greifswald flood defences to be realised. A particular focus of the work was on the design and thus the urban integration into the sensitive urban space. The project was awarded…

Read more

Stahlwasserbau Hochwasserrückhaltebecken Niederpöbel

The river valleys of the Osterzgebirge were and are often affected by devastating floods - for example in 1897, 1958, 2002 and 2013. After the 2002 flood, a flood protection concept was drawn up for the Rote Weißeritz river basin. Among other things, this provides for the construction of a flood retention basin in the Pöbeltal valley.

Client: Landestalsperren­verwaltung des Freistaates Sachsen

P…