1. Kainzmühl barrier  
… process for the upcoming renovation was carried out from mid-September to December 2023. In January 2024, the construction contract "Renovation measures to ensure the structural safety of the Kainzmühl dam by…  
2. Second construction phase at the Papierwehr in Erfurt  
It is certainly one of the most picturesque sites we are currently working on: the paper weir in Erfurt, right next to the historic Dreibrunnbad.  
3. Flood protection in Ebersbach  
…ersbach an der Fils was severely affected by the extreme flooding that occurred in the region in early summer 2024. Tractebel Hydroprojekt was awarded the contract by the Stuttgart Regional Council to implement several…  
4. Hydro power in Hambach?  
With the earlier lignite phase-out in Germany, coal production in the Hambach opencast mine will cease at the end of this decade. The subsequent use of the opencast mine by filling it as an opencast  
5. Construction progress Gleesen lock  
Together with partners, Tractebel Hydroprojekt is planning the replacement of five locks on the northern section of the Dortmund-Ems Canal. The new Gleesen lock is scheduled to be commissioned at the  
6. Iffezheim lock  
… replaced. Client: Wasserstraßen- und Schifffahrtsamt Oberrhein (branch Freiburg) Processing period: 2024 Main data: Year of construction: 1977 Dam target: NN + 123.60 m + 0.50 m surge (upstream), NN + 117.70…  
7. Application for the German Engineering Award  
The German Engineering Prize has been awarded four times so far, with the barrage in Greifswald and the Kienlesberg Bridge in Ulm being awarded twice to projects in which we were involved. This year,  
8. Großhesselohe weir  
… of the Großhesselohe weir facility. Client: Stadtwerke München GmbH Processing period: 2021 - 2024 Main data: a. Isar weir 3 weir fields, each 7.00 m, 17.15 m and 10 m wide Closure systems: Weir flap…  
9. Weilers/Bracht flood retention basin  
In the catchment area of the Kinzig with the most important secondary waters of Salz and Bracht, there have been repeated flood events in the past, which caused great damage in the settlement and  
10. New Niederfinow boat lift  
… The new Niederfinow boat lift was built between the old lift and the historic lock stairs. In 2024, the project was nominated for the German Engineering Award. Ship lifts are extraordinary and landmark…