The flood protection concept for the Zwickauer Mulde planned by Tractebel Hydroprojekt (formerly Lahmeyer Hydroprojekt) included protection measures for a 100-year flood for the town of Penig. The route was divided into separate lines in the HWSK: A, B, C1 and D. The section B planned by us runs parallel to Lunzenauer Straße and consists of two types of construction.
Client: Landestalsperrenverwaltung des Freistaates Sachsen
Processing period: 2009 – 2018
Main data:
Design water level: HQ100 (without freeboard)
Length of the planning section: 450 m
4 flood protection gates as trough access
Pressure-tight expansion of the Dittmannsdorfer Bach
Glass towers (0.7 x 1.2 m) in the reservoir areae
Services:
Replacement of the old quarry stone wall
Wall section with natural stone cladding and glass tops
Wall section without cladding and deep foundation
Replacement construction terrace made of sealed precast concrete elements