Special construction supervisions of steel hydraulic engineering and pipeline fittings at the Niederpöbel flood retention basin

The river valleys of the Eastern Ore Mountains have often been and are often affected by devastating floods – for example, 1897, 1958, 2002 and 2013. After the floods in 2002, a flood protection concept was developed for the Rote Weißeritz river basin. This includes the construction of a flood retention basin in the Pöbeltal.

Client: State Dam Administration of the Free State of SaxonyProcessing period: 2015 - 2019
Main-data:
    • Dammed Water: Red White Ritz
    • Catchment area: 12.1 km2
    • Storage space: 1.2 million m3
    • Shut-off structure: Rockfall dam with asphalt core seal 
    • 2 Contactor road passage
      • B x H approx. 10,000 mm x 6,000 mm
    • 2 Contactor eco-pass
      • B x H approx.6,100 mm x 5,000 mm
Services:
    • Production monitoring of the cone jet valves DN 1200, PN 10 of the operating outlets at the 
    • Production monitoring of all hydraulic steel structures of the closures, rakes and associated drive
    • Installation monitoring of all hydraulic stell structures and fittings including associated drive technology as well as commissioning support with functional tests

NEWS

May 26th, 2021

Recultivated future for former opencast mine

Tractebel hydro project plans and supervises: Weir construction at lake Sedlitz and siel…

May 11th, 2021

Pumped storage power plant Markersbach – increase in shuttle water volume approved

Due to the changed conditions on the energy market, pumped storage power plants are of particular…

April 5th, 2021

The challenges continue – the Lift bridge ensemble Lübeck

The planning task of Tractebel Hydroprojekt GmbH within the engineering community "HBL" with the…