Machine and steel water engineering

Special construction supervisions of steel hydraulic engineering and pipeline fittings at the Niederpöbel flood retention basin

The river valleys of the Eastern Ore Mountains have often been and are often affected by devastating floods – for example, 1897, 1958, 2002 and 2013. After the floods in 2002, a flood protection concept was developed for the Rote Weißeritz river basin. This includes the construction of a flood retention basin in the Pöbeltal.more


Greifswald-Wieck Flood Barrier

3D model of the flood barrier

Construction of a flood barrier at the German Baltic Sea Coastmore


NEWS

May 26th, 2021

Recultivated future for former opencast mine

Tractebel hydro project plans and supervises: Weir construction at lake Sedlitz and siel…

May 11th, 2021

Pumped storage power plant Markersbach – increase in shuttle water volume approved

Due to the changed conditions on the energy market, pumped storage power plants are of particular…

April 5th, 2021

The challenges continue – the Lift bridge ensemble Lübeck

The planning task of Tractebel Hydroprojekt GmbH within the engineering community "HBL" with the…