Yedigöl and Aksu Hydroelectric Power Plants

weir structure at Yedigöl HPP

weir structure at Yedigöl HPP

The cascade-arranged Yedigöl and Aksu Hydroelectric Power Plants (HPP) are situated at the Aksu river in northeastern Turkey. Tractebel Hydroprojekt GmbH (formerly Lahmeyer Hydroprojekt GmbH) conducted an examination of the existing feasibility studies and tender documents, pointed out necessary changes and was subsequently entrusted with the design overhaul. The changes focused primarily on the hydraulic systems and pressure tunnels as direct connection between intake and powerhouse.

The works began in 2009, commercial service commenced in autumn 2011 with the Yedigöl HPP. Tractebel Hydroprojekt GmbH (formerly Lahmeyer Hydroprojekt GmbH) served as owner's engineer during the construction works, verified and confirmed the construction documents and supervised the excavations.

powerhouse with generator units

powerhouse with generator units

pelton blade wheel

pelton blade wheel

grit channel

grit channel

throttle flap

throttle flap

NEWS

January 11th, 2021

Recertification audit successfully completed

At the beginning of November 2020, our annual external QM audit took place at the Magdeburg and…

January 8th, 2021

Flood protection Willows - dye ingestion by means of sheet wall inner gasket

The flood protection Weiden was manufactured in several construction phases from 1995 according to…

January 2nd, 2021

Planning of a dike re-laying in Calbe (Saale)

The state agency for flood protection Saxony-Anhalt plans to increase flood protection in the Area…