Our Magdeburg division was responsible for planning the renewal of the Meldorf floodgates and drives from 2017 to 2020. They were put into operation in 2020.
Now, four years later, the system has been drained and a thorough inspection has been carried out. Only cosmetic repairs had to be carried out as part of the measure. According to the operator, the new doors run reliably and trouble-free.